Project Overview: Warehouse
Warehouse area
After installation of HVAC ductwork and sprinklers
Worker installed wire to hang ceiling grid
Hanging the ceiling grid
Eliminator Track attached to ceiling grid
Wall studs snapped into place in Eliminator Track
Standing door frames
Progress of wall construction
Walls finished; floors prepped for carpet